Tuesday, December 16, 2008
Wiring up the front derailleur
Out comes the front dérailleur packing spacer.
Tug the cable taught, measure up and, with a sharp knife, cut off the excess cover.
Remember to have the 'third hand' to hand, so to speak.
On with the shield bellows and thread through the stop screw.
Check, using the trigger-shifter that everything works. Then torque up.
Whilst holding a beer in the other hand of course.
Tug the cable taught, measure up and, with a sharp knife, cut off the excess cover.
Remember to have the 'third hand' to hand, so to speak.
On with the shield bellows and thread through the stop screw.
Check, using the trigger-shifter that everything works. Then torque up.
Whilst holding a beer in the other hand of course.
Labels: building a bicycle, cycling
Subscribe to Posts [Atom]